Curated by
ACT
Investigate some of the mathematical challenges Boston engineers had to deal with during the Central Artery Tunnel Project (the "Big Dig"). This video focuses on the irregular shape of the casting basin and the volume calculations required to make the casting basin work, taking math out of the classroom and into real world problem solving.
3 Views
0 Downloads
Concepts
Additional Tags
Classroom Considerations
- Knovation Readability Score: 5 (1 low difficulty, 5 high difficulty)
- The intended use for this resource is Instructional