Lesson Plan

Teach Engineering: Show Me the Money

Curated by ACT

Students learn about the major factors that comprise the design and construction cost of a modern bridge. Before a bridge design is completed, engineers provide overall cost estimates for construction of the bridge. Students learn about the components that go into estimating the total cost, including expenses for site investigation, design, materials, equipment, labor and construction oversight, as well as the tradeoff between a design and its cost.

3 Views 0 Downloads
Classroom Considerations
  • Knovation Readability Score: 3 (1 low difficulty, 5 high difficulty)